Our Clients

Our Clients

We have the privilege of working with some of the most renowned and well known companies in the world. Our clients engage us in many ways and we engineer solutions to resolve their production problems.We build longterm relationships with our clients, and we succeed because of the quality in the people that we hire. We work diligently and with intelligence to ensure that the needs of our clients are held high with utmost importance.

  • Replacement of ball mill shell with had & trunion with diaphragm complete assembly.
  • Replacement of mill liners outlet trunion luaring & alignments of mill.
  • Replacement of girth gear of mill.
  • Replacement of kiln shell with girth gear, pinion & thruster.
  • Replacement of coal mill inlet shell with side ring & assembly.

  • Complete casing replacement with internals of raw mill line 1 gear box.
  • Replacement of roller’s & over hauling of same of Pfeiffer mills with tube liners.
  • Complete Retrofit of kiln line 2 D.B.C. length 145 meters c/c of Chinese D.B.C. to Amund make D.B.C. in record 20 days.
  • Complete overhauling of WPU 200 Gear Box Of Raw Mill kln 1
  • MECH - others
  • Over hauling of raw mill-1 gear box

  • VRM PEDESTAL REPAIRNG.
  • REPLACEMENT OF CEMENT MILL LINERS.
  • VRM roll assembly replacement

  • LBC Tail End Gearcoupling Replacement Mechanical Maintenance.

  • Decoloriser Girth Gear Replacement
  • Replacement of Shell below Girth Gear And Pinion
  • Decoloriser chute Replacement
  • LS VRM separator drive shaft overhauling
  • PC VRM separator drive shaft overhauling
  • Overhauling of WPU 200 Gear Box Of Mills
  • Raw Mill VRM 47.5 Maintenance Jobs
  • MAAG Gear Box Overhaul

  • Replacement of ball mill shell with head & trunion with complete shells & girth gear complete assembly.
  • Replacement of kiln shell’s of line 1 & line 3-7 nos.
  • Replacement of kiln girth gear & tyre of line 1.
  • Replacement of support roller’s of line 1 & line 3, - 3 nos.
  • Replacement of rotary cooler of line 1 kiln.
  • CM4 Symetro GB Guide ring and bearings Replacement and Rm 3 Seprator Work During Shut down.
  • Atox 42.5 Nozzle Ring Replacement Work.
  • Girth gear replacement work

  • Wagon loading clinker belt work
  • Belt installation work
  • Additive belt work
  • Belt installation work

  • Replacement of line 1 kiln shell with tyre assembly 70 MT Currently.
  • KILN Maintenance , Joint Welder , 93 MT Tyre shifting of Line 2
  • Complete dismantling over hauling & re-erection of VRM, COAL mills, Cement mills Gear boxes of line 1 and line 2.
  • Complete piping laying and commissioning of complete plant in rack and underground including rapping and coating with Fire Hydrant lines.
  • Dismantling /Erection and overhauling of Raw mill, Coal mill, Cement mill & Press rollers Gearboxes, Mill and Separator.
  • PH Calciner modification (Dismantling, Modification including increasing height 2.4 mt & erection of same at +63.4 mt without debricking with App Wt 210 MT in record time of 5 days.
  • Dismantling & relocation of POLDOS SR (proportioning feeder) from ground level to + 105 MTR level.
  • Erection & commissioning of Kiln feed belt bucket elevator (Amund make) total height +119.5 MTR with weight 255 MT in Record time.
  • Cement mill realignment in loaded condition (App. Wt 650 MT).Replacement of Polycom roller & gearbox App Wt 150 MT in record time of 2.5 days.
  • Cement mill Girth gear alignment and Replacement.
  • Cement mills slide shoe bearing replacement, White metal bearings, liners replacement
  • D.B.C. erection & commission.
  • Roller & table liner replacement of coal mill & raw mill within World record time of 17 hours.( without kiln stoppage).
  • Cooler up gradation.
  • Modification as per LV technology in raw mill separator.
  • All type of process Fan dismantling & erection.
  • Installation of total utility equipments.
  • E.S.P inlet planium with ducting, outlet ducting and all fields and replacement as per design of Thermax in record time of 14 days.

  • Replacement of Cement Mills Gear Box ,and Overhauling
  • Raw Mill Roller Replacement
  • Compensator Replacement
  • KILN Maintenance
  • New Hydraulic System Installation and Modifications
  • Coal Mill Gear Box Mod. ,Roller Tire and Guard Replacement And Replacement of Coupling ,
  • Dismantling and Re-Erection of Roller , Replacement of Table Liner With Dam ring
  • Replacement of Raw Mill Tires
  • Modification of Cement Mills and Gear Box
  • Kiln Main Drive CCR Side Replacement Job, Guide Block replacement of Tyre, Inlet Seal, Smoke Chamber Repair, Replacement O/l, Lamela Seal, Raw Mill Main Gearbox Replacement Work.
  • VRM Gearbox Overhauling Work.

  • LS VRM separator drive shaft overhauling
  • PC VRM separator drive shaft overhauling
  • Replacement of Decoloriser Shell , Tyre
  • Replacement of Decoloriser Shell Girth Gear
  • Decoloriser Inlet Chute Replacement
  • Thrust Roller Replacement and overhauling
  • Replacement of kiln line 1 middle tyre with shell, girth gear complete assembly with support rollers.
  • Replacement of kiln line 2 outlet shell with cowl shell & kiln hood complete.
  • Replacement of kiln line 2 inlet shell with segments.
  • Replacement of raw mill/ball mill girth gear with complete assembly.
  • For VRM Shutdown jobs
  • VRM Shutdown jobs
  • Kiln 1 major shutdown jobs

  • Replacement of line 1 kiln shell with tyre complete assembly.
  • Complete dismantling over hauling & re-erection of VRM, COAL mills, Cement mills Gear boxes of line 1 and line 2 and line 3.
  • Complete utility piping with Fire Hydrant lines in all 3 units of V.C, N.V.C and V.S.C app 230 km. Elevator Modification
  • Project pipeline. Water treatment, DM plant.
  • Project pipeline. Water treatment, DM plant.
  • Cooling towers.
  • Compressor, Blowers, Air dryers.
  • Complete modification of KHD supply preheater in both the units before given time period.
  • Complete modification of KHD supply preheater in both the units before given time period.
  • Cement mill Girth gear alignment and Replacement.
  • Cement mills slide shoe bearing replacement, White metal bearings, liners replacement
  • Replacement of gearboxes in vertical mills.
  • LINE- 1 Cement mill DPC Upgradation job
  • SILO feed elevator belt replacement work

  • Removal of movable roller
  • Movable roller bearing dismantling
  • Assembling of bearing on roller
  • Assembling of movable roller

  • COAL MILL ROCKER ARM CHANGING.
  • REPLACEMENT OF COOLER ID FAN IMPELLER.
  • ESP FAN IMPELLER & CONE REPLACEMENT.

  • Replacment of poycom roller bearing.
  • Maintenance and Repairing Services.
  • Maintenance Of Kiln Feed Belt Elevator Replacement.
  • Repair Of A-54/A-53 Dip Tube Of Commercial and Industrial Machinery.
  • Maintenance & Reparing Charges.
  • Maintenance and Repari Services of Polycom- 1 Movable Roller Replacement.
  • Maintenance and Repari Services of Polycom- 1 Roller Replacement (Charges of Crane).
  • Replacement of Fixed and Movable Roller RP-1 Roller Press.
  • Replacement of Secondary Rotor Of Quarry Crusher.
  • Replacement of Polycom Roller Bearing Of CM - 02.
  • CCW kiln middle tyre replacement job.
  • CCW kiln support roller replacement job
  • Polycom-2 both roller replacement

  • Replacement Of R / VRM Main Drive Gearbox.
  • Replacement of BVC raw mill Main Drive Gear Box of commercial and Industry Machinery.
  • Replacement of R/VRM and VRM Grinding Roller and Louver ring Segment commercial and Industry Machinery.
  • Replacement of R/VRM and VRM Grinding Roller and Replacement of kiln, Outlet Brick Retanier Ring Repair.
  • Replacement of Polycom Floating Roller Non Drive end Bearing.
  • Replacement of poycom roller

  • Coal mill gear box overhauling with complete liners, table Liners, rollers and body with separator dismantling and replacement with alignment.
  • FLS 42.5 Raw Mill Gear box dismantling overhauling and erection of mill no 1 and mill no 2 within Record time of 7 days
  • Kiln Hood Replacement in Record time.
  • CSymetro Gear Box of Mill no 1 & 2 overhauling and commissioning.
  • 5.Caol Bunker and fine coal silo bins Dismantling and erection.
  • Replacement of grinding roller
  • Maintenance of clinker breaker
  • Maintenance of crusher work

  • Complete maintenance, Operation of Plant Covering LS Crusher, Stacker, Reclaimer, Additive Box Feeder , Additice Crusher , Conveyor belt feeding , Cement Mill Hopper .
  • Cooler Modification Plate Replacement Elevator Modification
  • Feed Pipe Dismantling and Erection Works
  • Policom Roller Replacement

  • Gearbox oberhauling work KMPP851 Raw Mill.
  • Pre-heater Fan Bearing Replacement.

  • Raw Mill Roller Assembly Replacement.
  • M Roller Tyre Replacement In CM - 2 and Repacement Of Table Liner Of CM-2.
  • Complete Overhauling Of Cement Mill Feed Rotary Air Lock dismantling and installation Repairing.

  • Replacement of gear box with over hauling in complete of raw mill line 1.
  • Raw Mill roller no.03 replacement.
  • Coal Mill Separator (RAKM-30) Seal and Louvers Replacement During L-3 Shutdown.

  • Raw Mill and coal mill (FLS Gear Box) Replacement ofsplined ring and output shaft, replacement of high-speed pinion bearing bottom eye pin and bearing of hydraulic cylinder, separator louvers, rollers.
  • Cowl shell of kiln replacement in record Time of 4 days.
  • Cement mill liner changing of second chamber with app wt. 65MT in record time of 3 days
  • Replacement of Kiln outlet lamella seal by Iticca Seal in record time of 36 hrs.
  • Replacement of Raw mill and coal mill Rollers, table liners etc.
  • Kiln hood replacement.
  • E.S.P duct modification.
  • Wagon loading splitting work of two into 6 parts loading with complete up gradation in record time of 6 days.
  • Additive system Fabrication and erection.
  • Cement mills gearboxes and girth gear replacement and overhauling.
  • Crusher rotor, belts, vobbler, screen house, apron etc complete maintenance and overhauling.
  • Fly ash handling and coal pipe line erection and commissioning.

  • SVC,M/D GBX replacement of parts / APH

  • Replacment of VRM roller tires
  • Replacement of 02 Nos.
  • VRM Roller Tires & 01 No. Complete Roller

  • Complete dismantling over hauling & re-erection of gear box of Vertical Cement mill make lochae and gear box flender.
  • Complete erection and commissioning of rack and underground piping for water, air and hydraulic lines of complete plant.
  • Erection of water softening and water filtration plant with complete fire hydrant pipe line erection and commissioning.
  • Complete Utility system erection and commissioning of plant.
  • Erection and Commissioning of elevators, conveying systems, trailor tipplers , packing plant and weigh bridges.

  • MAAG Gear Box Overhauling

  • Replacement of Girth gear and input pinion of Cement Mill in record time of 5 days.
  • Truniun bearing replacement.

  • Replacement of chains, buckets and rails of old D.B.C no 1 and 2 and erection of same in stipulated time.
  • Replacement of tip casting of kiln no 2 in record time of 7 hours.
  • Erection and commissioning of fly ash handling System and its complete piping.
  • Replacement of G.C.T ( Gas Conditioning Tower no 2) shell, cone and duct at upto 70 mtr height with app. Wt. 85 MT including H.P piping with dismantling and Erection of new within record time of 13 days.

  • Duration 1984-86 Total piping of complete Plant
  • Esp, treatment plant, belt conveyers, sheds
  • Pollution control equipment and related ducting.

  • Complete Piping of Air conditioning units 1974 -83 like Hitachi, Voltas, Blue Star & Carriers systems pipe lines, Steam lines, Condensate pipe line, Water supply system, Cooling towers, air handling units, Dyfeel & Morlotherm boilers & its piping, spinning & weaving machines, S.S, M.S, aluminum tanks.

  • Installations of Wartsilla make DG sets (3 x 6.5 MW).
  • Complete Piping network water,air and oil( with argon root) with water coolers system and R.O system under the inspection of M/s Wartsilla.
  • Replacement over hauling of raw mill gear box complete weight 145 MT.

  • Raw Mill and coal mill (FLS Gear Box) Replacement ofsplined ring and output shaft, replacement of high-speed pinion bearing bottom eye pin and bearing of hydraulic cylinder, separator louvers, rollers.
  • Complete Piping of Air conditioning units 1974 and 83 like Hitachi, Voltas, Blue Star & Carriers systems pipe lines, Steam lines, Condensate pipe line, Water supply system, Cooling towers, air handling units, Dyfeel & Morlotherm boilers & its piping, spinning & weaving machines, S.S, M.S, aluminum tanks.

  • Piping of Ammonia plant, Steam line in fertilizer, water pipe line & structure of carbide plant.
  • Maintenance in Shell house. Repairing & maintenance of burner furnace in fertilizer.

  • 1985-86 Total water and air pipelines of complete plant
  • Installation of compressors, pumps, DM plants.
  • Fabrication and erection of water tanks, compressor house shed, pump house shed and cable trays.

  • Complete utility equipments like compressor and blowers
  • Complete Water and Air piping.
  • Complete Fire Hydrant line erection and commissioning.
  • App. 2350 MT Plate work and Structure Fabrication and Erection within 7 months under inspection of M/s M.N Dastoor and Co.

  • Complete Piping of Air conditioning units 1974 to 83 like Hitachi, Voltas, Blue Star & Carriers systems pipe lines, Steam lines, Condensate pipe line, Water supply system, Cooling towers, air handling units, Dyfeel & Morlotherm boilers & its piping, spinning & weaving machines, S.S, M.S, aluminum tanks.

  • Complete Raw mill section ducting , plate work and structural work fabrication and erection.
  • Kiln hood erection and commissioning with kiln shell.


Quick Links