Aditya Cement Works, Shambhupura

Aditya Cement Works, Shambhupura

  • Replacement of line 1 kiln shell with tyre assembly 70 MT Currently.
  • KILN Maintenance , Joint Welder , 93 MT Tyre shifting of Line 2
  • Complete dismantling over hauling & re-erection of VRM, COAL mills, Cement mills Gear boxes of line 1 and line 2.
  • Complete piping laying and commissioning of complete plant in rack and underground including rapping and coating with Fire Hydrant lines.
  • Dismantling /Erection and overhauling of Raw mill, Coal mill, Cement mill & Press rollers Gearboxes, Mill and Separator.
  • PH Calciner modification (Dismantling, Modification including increasing height 2.4 mt & erection of same at +63.4 mt without debricking with App Wt 210 MT in record time of 5 days.
  • Dismantling & relocation of POLDOS SR (proportioning feeder) from ground level to + 105 MTR level.
  • Erection & commissioning of Kiln feed belt bucket elevator (Amund make) total height +119.5 MTR with weight 255 MT in Record time.
  • Cement mill realignment in loaded condition (App. Wt 650 MT).Replacement of Polycom roller & gearbox App Wt 150 MT in record time of 2.5 days.
  • Cement mill Girth gear alignment and Replacement.
  • Cement mills slide shoe bearing replacement, White metal bearings, liners replacement
  • D.B.C. erection & commission.
  • Roller & table liner replacement of coal mill & raw mill within World record time of 17 hours.( without kiln stoppage).
  • Cooler up gradation.
  • Modification as per LV technology in raw mill separator.
  • All type of process Fan dismantling & erection.
  • Installation of total utility equipments.
  • E.S.P inlet planium with ducting, outlet ducting and all fields and replacement as per design of Thermax in record time of 14 days.